Out of a half-century career of creative and prolific work, Rudolph’s Burroughs Wellcome headquarters & research center stands out as one of his finest works. We’re now fighting to save this magnificent example of the convergence of corporate & scientific vision and architectural talent—and we thought it would be useful to share an outline of it’s history, purpose, and features.
A SITE FOR GROWTH: THE RESEARCH TRIANGLE PARK
Founded in 1959, Durham, North Carolina’s Research Triangle Park is one of the most prominent research developments in the US. This is where hundreds of distinguished firms and organizations located their headquarters and research centers—and it is here that Burroughs Wellcome placed their US headquarters and laboratories.
They chose Paul Rudolph as their architect, and the project commenced design work in his office in 1969, and was completed and dedicated in 1972.
Burroughs Wellcome was designed for growth: the initial, main body of the building, was followed by several additions—in 1976, 1978, and 1982—all designed by Rudolph. His work in 1982 also included a master plan for the overall site.
The story of Durham’s Research Triangle Park is comprehensively told in Brain Magnet: Research Triangle Park and the Idea of the Idea Economy by Alex Cummings, PhD—and this fascinating study includes coverage of the Burroughs Wellcome building.
THE BUILDING: ITS PURPOSE, HISTORY, AND FEATURES
In February 1969, pharmaceutical company Burroughs Wellcome purchases a little over 66 acres of rolling woodland in Durahm, North Carolina’s Research Triangle Park. The company is a subsidiary of The Wellcome Foundation Ltd., based in the UK.
The client requests of Paul Rudolph a design that will be shaped to its needs, yet remain architecturally distinctive.
Flexibility is a primary goal: each major area in Rudolph’s plan—laboratories, administration, and support services—are capable of being expanded by linear addition. To allow for this, Rudolph leaves the expansible ends of the building expressed as a pattern of flattened hexagons, so that the elements can be extended horizontally without disturbing the building’s visual order.
The building program includes 312,303 square feet of research laboratory and administrative space, including: 140 labs, a library, auditorium, cafeteria, and support activity spaces for 400 workers.
In plan, the building forms a giant “S”, with opposing arms that form a main entry court and a large service yard. Reception, cafeteria, library, auditorium, and administrative offices flank the entry court. Laboratories, research offices, and testing facilities surround the service yard.
The building exterior (and parts of the interior) is finished with a limestone aggregate which is sprayed-in-place, into to a plastic binder. [Rudolph used the same textured finish in several subsequent projects.] This exposed aggregate finish was used on 140,000 square feet of exterior walls and 90,000 square feet of interior walls. Rudolph estimated the finish required 20,000,000 stones to complete!
The building’s structure is an eccentrically loaded trapezoidal steel frame, with columns inclined at 22.5 degrees. Rudolph’s original slant of the design was changed at the request of the building’s structural system. This is the sort of practical accommodation that an architect who’d been long in practice, like Rudolph, would be used to receiving and accommodating.
The building is dedicated on Friday, April 7th 1972.
A collectors medallion is issued to celebrate the dedication which features a rendering of the building on one side, and a unicorn (the company’s logo) on the other side.
As part of the dedication ceremony, Rudolph gives a walking tour of the building. He writes a description of the building saying, “the building is conceived as a man-made extension of the ridge upon which it is built. The building is terraced, each floor being smaller that the one below it. Its placement allows people to enter from below walking through a courtyard and porch into the lobby.”
The building interior and exterior are used as part of the set for the 1983 science fiction film Brainstorm starring Christopher Walken and Natalie Wood.
The building is originally known as the Burroughs-Wellcome Company Headquarters (and later the GlaxoSmithKline Building.)
The original building has several additions, all designed by Paul Rudolph, including: a Main Building addition in 1976, a Toxicology/Experimental Pathology Building addition in 1978 and a South Building Expansion in 1982. Rudolph also was asked to create a new Masterplan for the site in 1982.
The building is closed to the public for decades for security reasons, while pharmaceutical companies Glaxo, Glaxo Wellcome, and GlaxoSmithKline (GSK) actively use it as offices and research laboratories. Employees are not permitted to take cameras into the facility, due to the sensitivity of the research being conducted.
The building is renamed the Elion-Hitchings Building in 1988, honoring Gertrude Elion and George Hitchings - research chemists with Burroughs Wellcome who shared the 1988 Nobel Prize in Physiology or Medicine with Sir James Black. Their prize-winning research was done while they were working at the building.
On April 21, 1989 four ACT UP activists barricade themselves inside an office in the building: they demand a cut in the price of AZT (at that time the most expensive medicine in history.)
In 1995, Burroughs Wellcome and Glaxo merge to become Glaxo Wellcome, and a merger between that company and SmithKline Beecham establishes the company as GlaxoSmithKline. The company’s operations are then relocated another facility.
In February 2010 the building is listed for sale.
On June 30 2012, Glaxo sells its iconic Elion-Hitchings Building, two interconnected office building, ,and 140 acres of land for $17.5 million to United Therapeutics.
On October 20 2012, the building is opened for a public tour, arranged by Triangle Modernist Houses (now USModernist) with United Therapeutics. A video of the event can be watched here.
United Therapeutics demolishes part of the structure in 2014.
On September 4, 2020 United Therapeutics is issued a demolition permit for the building from the City of Durham. Clear Site Industrial, LLC is listed as the demolition contractor.
SAVE THIS GREAT ARCHITECTURE
Losing Burroughs Wellcome would be a cultural disaster—a titanic loss to our country’s cultural heritage.
When a great building is destroyed, there are no second chances.
FOR NOW, THERE ARE TWO THINGS YOU CAN DO:
Sign the petition to save Burroughs Wellcome. You can sign it here.
We’ll send you bulletins about the latest developments. To get them, please join our foundation’s mailing list: you’ll get all the updates, (as well as other Rudolphian news.)—you can sign up at the bottom of this page.